
ENCOTEC started the work on Oil Pumps Modification at Azertrans Terminal in frame of 30” Pipeline Construction project for SOCAR Midstream Operations.
June 2022
The work includes:
- Geodetic survey
- Detailed Design of pumps
- Detail Design of Telecommunication
- As-builts of NIPI drawings for 30" pipeline
Please discover the opportunities and register your interest at our AI assisted talent acquisition agent at www.encotec.pro
SKS Plaza, 49 Fizuli str., 5th floor and 8th floor AZ1014 Baku, Azerbaijan